Global grid infrastructure and energy storage must step up to avoid delaying 2030 targets, a report by the International Renewable Energy Agency (IRENA) says.
A review of 2024 reports from the International Renewable Energy Agency (IRENA) has shown that despite record investment and capacity growth, the world is off track to meet 2030 climate targets.
Energy Optimisation Solutions (EOS), a developer backed by Quinbrook Infrastructure Partners, has submitted plans for a 100MW battery energy storage system (BESS) to be built at the Teesworks development on Teesside.