Construction of ScottishPower’s solar farm at the Carland Cross hybrid wind, PV and energy storage site has begun, with the first of the 10,000 panels installed by Prime Minister Boris Johnson.
Aberystwyth University has unveiled its plans for the installation of a ground-mount solar array at a site adjacent to its Fferm Penglais student accommodation.